About this Project
37,261 SF renovation on the fourth floor and 750 SF renovation on the lower level to include demolition, millwork, new doors, interior glazing, acoustical ceilings, ceramic tile, resilient flooring, access floor modifications, banquet seating, motorized shades, plumbing, HVAC and electrical.